Dear All, The lawsuit requires that PRT beryllium utilized for a maximum of 5 accumulation orders. After the 5th order, the support beingness of the PRT volition expire, it should beryllium consumed and replaced with a caller PRT for the 6th accumulation order. Is it OKAY to usage Equipment PRT successful this case?? We person already created the Equipment PRT, on with a antagonistic and a attraction plan, and assigned it to the routing of the finished goods (FG) material. After confirming the accumulation order, study is generating(Tcode- IK17) for the quantity of instrumentality consumed. However, however tin we get the study connected ground of PRT utilized successful No. of accumulation orders and its regularisation beyond 5th accumulation order.
Please assistance successful these case, its rather urgent
Thanks, Raj Tilak
Thanks successful advance