Setup Time from Routing is used although Setup Category with Setup Matrix was created and assigned

5 days ago 2

Hi,

i created Setup Category Group and Setup Matrix and assigned it to the Operation successful Routing and one CIFed the  Setup Group to PP/DS and its disposable successful PDS(see snippet). Nevertheless the planned orders one created for the worldly see the setup clip from routing and not from the setup matrix. Do idiosyncratic cognize why?

emirsalibasic_0-1729770754004.png

BR
Emir

Read Entire Article