Migration to embedded PPDS - existing WIP production orders in APO PPDS standalone

3 weeks ago 6

Hello everyone,

when migrating to embedded PPDS connected S/4 , determination are existing WIP accumulation orders successful APO PPDS standalone linked to an SAP ECC, each existing WIP accumulation bid successful PPDS tin person operations manually scheduled via PPDS readying board, with a fixed series decided by the planner (e.g., maintaining much buffer clip betwixt operations, and truthful on).

These orders indispensable beryllium past moved from S/4 , aft conversion, to embedded PPDS connected S/4 via report /SAPAPO/PPDS_DELTA_ORD_TRANS. But erstwhile the bid reaches embedded PPDS, its operations are scheduled backward from the bid basal extremity date, arsenic per SAP002 strategy illustration successful integration with R/3 acceptable successful /SAPAPO/RRPCUST1 t-code , truthful the archetypal scheduled dates of the operations mightiness beryllium lost.

Is determination immoderate disposable strategy to support the existing scheduled dates of the operations, oregon does the planner person to manually re-schedule each the operations, arsenic they were successful aged PPDS standalone ?

Many acknowledgment and champion regards

Giuseppe

Read Entire Article