Hi,
The lawsuit is following. In MD04 I person Sales bid and Purchasing order.
1. Sales bid - day is 01.05.2024
Purchasing bid - day is 31.08.204. But Rescheduling day is 01.05.2024 (exception 10).
It is clear, since strategy reschedule Purchase bid to screen request of Sales order.
2. ATP cheque (CO09) for Sales bid shows availability day 01.05.2024 (based connected rescheduling date).
The occupation is that I inactive request availability day 31.08.2024 (NOT rescheduling date).
>>> So I request to de-activate rescheduling relation for the Material. Therefore, successful OMDW I person created caller Material Group with Rescheduling horizont = 0. Both Tolerance are besides = 0. Then I assigned Material radical to Material Master. But it does not help, due to the fact that rescheduling inactive happens, adjacent for caller orders.
Are determination immoderate configurations which could help? I bash not interaction OPPQ for Plant since consider, that MRP Group has higher priority.