We are integrating S4 with our MES.
We privation to let changes to the Production Order from the clip is it released to the MES, up until the clip an MES relation clicks a fastener that says, "I've started moving connected this Production Order."
Is determination an API telephone oregon message that the MES tin nonstop to S4 to lock the accumulation order from further changes?