In EWM while using Putaway strategy system determining always a empty bin

1 day ago 1

Hi all,

I person configured the EWM Putaway strategy, utilized retention benignant hunt series and BIN determination.

I person maintained the Control Indicator besides successful the product. Still, portion executing it is ever searching the bare bin and showing successful the WT. My retention benignant Putaway regularisation is "2 i.e summation to existing stock"

Read Entire Article