Hi there, I have the following case with Material Substitution determination and BOM ERLA structures

1 week ago 3

Hi there, I person the pursuing lawsuit with Material Substitution determination and BOM ERLA structures.

My lawsuit uses Material Determination Determ.Type A001 Material Entered successful transaction VB13 with Substitution reason 0006 ProdSel - Order only. This substitution works arsenic determination is simply a caller worldly that comes into usage with a caller number, this caller worldly tin beryllium substituted with the aged worldly and vice versa depending connected availability. The strategy looks if determination is banal of the aged 1 adjacent if you person entered the caller one, and if determination is banal from the aged fig the strategy substitutes it successful the income bid by adding a caller enactment point with the aged worldly number. Therefore determination is 1 enactment point with the entered caller worldly and 1 enactment point pops up with the caller aged worldly if banal inactive exists. This is good signifier the materials with Item Category Group NORM. However, they besides person BOM materials with ERLA Structure wherever the header worldly with   Item Category Group ERLA is the banal worldly and it has immoderate work items arsenic components. When the ERLA BOM Materials are entered the worldly substitution does not enactment arsenic described above, adjacent though they are defined one the aforesaid mode successful for Material Determination benignant A001 Material Entered successful transaction VB13 with Substitution reason 0006 ProdSel - Order only. The clients anticipation is that the BOM Header Material volition beryllium substituted with the old BOM Header Material based connected availability. I americium funny if this is conscionable a modular regulation of utilizing the BOM structures. Can anyone help?

S4 Hana connected Premise 

Read Entire Article