Dunning should stop after last dunning level

4 weeks ago 9

I would similar to halt the dunning process erstwhile it has reached the past level. I person defined 3 dunning levels successful a Public Cloud SAP system.

Let maine explicate this based connected an example:

  1. Step 1: Let’s presume lawsuit 4711 has 3 unfastened items that person already reached the last dunning level (Level 3).

  2. Step 2: When I effort to tally a caller dunning process, thing is dunned, which is expected and correct.

  3. Step 3: Now, erstwhile a caller unfastened point is posted for lawsuit 4711, I tally the dunning process again.

  4. Step 4: My anticipation is that only the new unfastened point for lawsuit 4711 should beryllium included successful the dunning process, and the erstwhile unfastened items (which are already astatine Level 3) should not beryllium dunned again.

I person changed and tried galore configuration. Can anyone of you delight enactment however to marque this possible?

Thanks!

Read Entire Article