Cannot create planning scope with production BOM

3 weeks ago 7

BOM with engineering usage tin lone beryllium utilized to make readying scenarios. So Engineering BOM usage E needs to beryllium configured accordingly. The BOM should beryllium created with this usage E
SIMG - Production - Basic Data - Bill of Material - General Data - BOM Usage - Define BOM Usages

RaghavanKathamuthu_0-1730385069521.png

SIMG - Production - Basic Data - Bill of Material - General Data - BOM Usage - Define Default Values for the Item Status

RaghavanKathamuthu_1-1730385069520.png

SIMG - Production - Basic Data - Bill of Material - General Data - BOM Usage - Define Copy Default for Item Status

RaghavanKathamuthu_2-1730385069519.png