Hi Experts,
When we are utilizing sum illustration successful MRP presumption 2, the information banal is changing aft adjacent time MRP tally for the existent month. Kindly find the details below.
When I tally the MRP connected 08/06/2024 the strategy calculated information banal arsenic 646,153. 844
But erstwhile I tally MRP contiguous the information banal changed to 67200.00. There is nary alteration successful the request (PIR) oregon sum profile.
we are utilizing 14 days sum illustration calculation.
Total PIR for the archetypal play is 1,200,000KG arsenic per the readying calendrer P11 nary of days are 35. And my readying calendar starts from 07/28/2024 to 08/31/2024
So my information banal indispensable beryllium astir 480,000.00 KG arsenic per the calculations ( (1,200,000/35)*14).
When we tally the MRP connected 6th Aug, strategy cipher dynamic information banal as 646,153. 844 KG, calculation ((1,200,000/26)*14). 26 are the remaining days successful the readying calendar connected 6th Aug.
When we tally the MRP connected 7th Aug, strategy cipher dynamic information banal as 672,00.00 KG, calculation ((1,200,000/25)*14). 25 are the remaining days successful the readying calendar connected 7th Aug.
As per my knowing strategy should see full fig of days successful the readying calendar, but not the remaining days near successful the period.
Kindly fto america cognize if determination are immoderate parameters isolated from sum illustration effecting sum profile.
Regards,
Varma