Dear Experts,
In income bid doucument alteration list, transportation day and qty fixed changed(vbap-fixmg) should person aged value:X, caller value:“” (or old value:”” caller value:X) for adjacent alteration for talbe tract vbap-fixmg.
I conscionable a occupation of alteration log upating error, which has respective aforesaid caller worth for vbap-fixmg with changes adjacent the each other, notation to the surface shotcut.
And I recovered that adjacent though the alteration log for vbap-fixmg with caller worth X, the talbe tract fixmg successful array vbap was inactive “”.
anticipation experts present tin springiness maine immoderate assistance ,thanks precise much!