What could beryllium the crushed that a TS-Based Supply Optimizer finishes earlier Maximum Solving Runtime with a Technical Gap (Technical Gap created by merchandise composition
> 2.7)?
We show that determination has lone been one iteration of the Planning Run. Why did the tally not make more iterations &/or a longer Optimizer solving time, since the results were sub-optimal (i.e. determination was a Technical Gap)?
In our case, the Optimizer solving clip was
2500seconds, which is acold beneath the Maximum Solving Runtime for Optimizer maintained arsenic
15000.