TS-Based Supply Optimizer finishes before Maximum Solving Runtime with Technical Gap (1 iteration)

1 month ago 20

What could beryllium the crushed that a TS-Based Supply Optimizer finishes earlier Maximum Solving Runtime with a Technical Gap (Technical Gap created by merchandise composition

> 2.7

)?

We show that determination has lone been one iteration of the Planning Run. Why did the tally not make more iterations &/or a longer Optimizer solving time, since the results were sub-optimal (i.e. determination was a Technical Gap)?

In our case, the Optimizer solving clip was 

2500

seconds, which is acold beneath the Maximum Solving Runtime for Optimizer maintained arsenic

15000

.

Read Entire Article