Dear Community,
I'm seeking to recognize whether DM should show (SFC report) the depletion of components based connected backflush triggered by Production Order Yield Confirmation successful IM-managed retention locations. My presumption was that confirming an cognition would automatically devour each BOM components marked arsenic "backflush enabled." However, I observed that nary messages for backflush were generated, and DM does not bespeak that backflushing occurred, contempt the information that 261 movements were correctly generated successful the S/4HANA system.
I'm utilizing consolidated inventory mode, possibly it is someway related.
Kind regards,
Blazej