Profit center change in Material Master

2 months ago 14

Hi Experts,

One of our lawsuit is presently created the Profit = merchandise group, with that helium is not capable to make the Plant level reports, hence asking to created the caller nett center @ Plant level for the reporting purpose,

while effort to alteration the Profit for the aforesaid successful the worldly maestro strategy propulsion the beneath error.

Please propulsion lights connected this is determination immoderate mode we tin execute without the inconsistence.

ERROR:

You privation to alteration the nett halfway but worldly banal inactive exists           

Message no. MM335    

Diagnosis            

 You privation to alteration the nett halfway successful the worldly maestro record.       

However, changing the nett halfway could pb to inconsistencies successful FI 

because banal information already exists for this material.         

Examples:          

O Stock information already exists for a worldly and was posted with profit      

center 'A' according to the existent duty successful FI. If you change           

the nett halfway successful the worldly maestro (for example, to 'B') and              

the existent banal is consumed, nary of the aged banal would beryllium used        

Procedure          

If you privation to alteration the nett halfway to beryllium changed, proceed as          

follows:               

  1.             Determine the imaginable effects of a nett halfway alteration connected the             

corresponding equilibrium expanse successful FI

  1.             You tin alteration this connection from an mistake connection to a warning. Do   

this successful the IMG enactment Define Attributes of System Messages (work      

area MM, connection fig 335).

Regards,

Santhosha BH

Read Entire Article