Hello Experts,

I person a requriement, the readying of components that are provided to a subcontracting Vendor should beryllium planned seperately astatine antithetic MRP country level. Detailed mentation is arsenic follows,

  1. A finished worldly (FG123) has a BOM constituent (SFG123) that undergoes worldly subcontracting process.
  2. The Finished worldly (FG123) is produced successful 2 differnent MRP Area (1234_A &1234_B) which is of benignant 02 (Storage Location MRP Area).
  3. The Dependent Requirement of SFG123 volition besides beryllium generated astatine each MRP country seperately.
  4. Post MRP Run, the Subcon PR for SFG123 volition beryllium generated astatine each MRP Area.
  5. The Subcontractor requirements of the Material provided (SubReq) of the components that are provided to the vendor is lone generated astatine works level and not astatine each MRP Area level, hence the procurement volition besides beryllium done lone astatine works level.

The concern requriement is to make the SubReq seperately astatine each MRP Area level and the consequent procurement connection for RM123 to beryllium generated astatine S.Loc MRP Area seperately and not astatine the Plant MRP Area level.

Pls fto maine cognize if it is imaginable to make SubReq and PR astatine MRP Area for RM123.

Thanks successful Advance.