Is it imaginable to person a multi level MTO accumulation orders?
Condition:
1. Finished bully has strategy 20 and fixed batch size of 30
2. Sub assembly has fixed batch size of 10. (I person tally with corporate bid mounting 52, but lone 1 constituent accumulation bid is created per finished bully accumulation order. I person besides tally with strategy 20, but did not expect that to work, arsenic the sub assembly worldly is not connected the income order)
The desired effect is to person 1 finished goods accumulation bid and 3 sub assembly orders. All accumulation orders would person the income bid tab, with the income bid data, connected the accumulation bid wide information tab.
Thank you