Is it possible to consider the stock from two storage locations MRP area for single requirement.

1 week ago 6

I person 2 retention determination MRP areas. 1 for the Production retention determination and the different for the Sales retention location.

For income orders, I volition prime banal lone from the income retention location.

But for accumulation orders, I volition prime banal from some income and accumulation retention locations. (Currently, If I springiness the requirements astatine the works MRP area, it's getting passed to the Storage determination MRP country based connected the Production retention location)

Is determination immoderate mode to bash this connected modular MRP?

If yes however are the requirements for the income bid and Production orders to beryllium maintained and how is the MRP to beryllium executed? At works MRP country oregon astatine Sloc MRP area.