How to distribute manufacturing costs to Cost Center?

4 months ago 26

Hi SAP Community,

In immoderate accumulation scenarios you tin allocate manufacturing costs to a non-material (non-MAT) receiver similar outgo center, WBS element, and bid alternatively of worldly inventory.

In this case, successful event-based accumulation outgo posting, WIP capitalization is not applicable for manufacturing orders without colony to material. Therefore, for these orders, costs allocated from goods contented oregon confirmation volition beryllium passed instantly to the defined non-MAT receiver (cost center, WBS element, oregon order). The pursuing posting is made:

  • Consumption connected non-MAT receiver is debited.

  • Consumption connected manufacturing bid is credited.

If the goods transportation is posted, the costs volition beryllium deduced successful the non-MAT receiver, and the pursuing posting volition beryllium made:

  • Consumption connected manufacturing bid is debited.

  • Consumption connected non-MAT receiver is credited.

Event-based outgo organisation is status-independent and volition beryllium posted astatine each goods issue, confirmation, oregon goods receipt. Therefore, the full existent costs of the manufacturing bid is ever 0.

Kindly cheque the beneath SAP Help Portal documentation for much details:

Event-Based Cost Distribution Posting (non-MAT Receivers)

Best Regards,
SAP Support

Read Entire Article