GoI issues guidelines for Installation and Operation of EV Charging Infrastructure-2024

1 month ago 14
Old 18th September 2024, 20:28   #1

Senior - BHPian

 
ferrarirules's Avatar

Join Date: Aug 2017

Location: Faridabad

Posts: 1,009

Thanked: 3,770 Times

GoI issues guidelines for Installation and Operation of EV Charging Infrastructure-2024


The powerfulness ministry has announced caller guidelines for electrical vehicles charging infra. The caller guidelines speech astir pursuing main points -

1. Transparency of charging tariff
2. Time of time tariff for charging stations
3. Provision of nationalist onshore astatine promotional rates for Public Charging Stations
4. Residential charging setup.
5. Vehicle to Grid

Quote:

Ministry of Power issued "Charging Infrastructure for Electric Vehicles ? Guidelines and Standards" successful 2018 which were amended from clip to time.After cautious information and suggestions received from assorted stakeholders, it has been decided that determination is simply a request to bring greater clarity with regards to the applicability of these guidelines to public, semi-public and backstage charging stations, Power Utilities, Central & State agencies. Accordingly, revised consolidated guidelines titled "Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024",as mentioned successful the consequent para of these guidelines, are hereby issued.

1. Transparency of charging tariff

The CPOs volition person to present divided their charging rates into 4 parts - Electricity proviso tariff, Service complaint (capped spot details below), Land outgo and GST. Details arsenic per guidelines

Quote:

The full interest charged by Charge Point Operators from customers shall comprise the pursuing components: -
a. Electricity proviso tariff which volition beryllium considered arsenic walk done (Rs. per kWh).
b. Service charge arsenic per Clause 10.0 of these guidelines (Rs. per kWh).
c. Land cost which volition beryllium walk done arsenic per registered onshore deed (Rs. per kWh).
d. GST arsenic applicable.

Service charges are capped based connected benignant of charging and clip of day

Quote:

Service charges for EV Charging Stations
(1) The pursuing ceiling bounds for work charges (excluding GST & onshore cost) shall beryllium applicable till 31st March, 2028 for conductive AC/DC charging astatine PCS & Community EV Charging Stations setup connected either nationalist oregon backstage land.
GoI issues guidelines for Installation and Operation of EV Charging Infrastructure-2024-screenshot-20240918-185121.png

*Note: These ceiling bounds are taxable to yearly review.
(2) Central and State governments whitethorn connection subsidies for mounting up nationalist charging
stations.
(3) Transparent Pricing: EV Charging Stations volition prominently display:

a. Charging rates per unit.
b. Applicable work charges.
(4) A committee nether the Central Electricity Authority (CEA) volition urge work charges from clip to time.

2. Time of the time tariff for charging stations

Electricity proviso companies volition complaint little rates successful Solar hours and higher rates successful non star hours

Quote:

(1) The tariff for proviso of energy to EV Charging Stations shall beryllium azygous portion and shall not transcend "Average Cost of Supply" till 31st March 2028.
(2) The Distribution Licensee volition complaint 0.7 times the Average Cost of Supply (ACoS) during star hours (9:00 AM to 4:00 PM) and 1.3 times ACoS during non-solar hours (remaining hours of the day).
(3) Each EV charging presumption indispensable person abstracted metering arrangements to accurately grounds depletion and use the due tariff.

3. Provision of nationalist onshore astatine promotional rates for Public Charging Stations

Revenue sharing exemplary for lowering of onshore cost. Govt entities tin supply onshore to different govt entities @ Rs.1 per KWh and to backstage subordinate via bidding with level terms arsenic Rs. 1 per KWh.

Quote:

1)Government/Public entities shall connection onshore for installation of PCS astatine a subsidized complaint to Government/Public entity. This volition beryllium a revenue-sharing exemplary wherever the land-owning bureau receives 1 per kWh of energy utilized for charging astatine the station, to beryllium paid quarterly. The gross sharing statement whitethorn beryllium initially entered by parties for a play of 10 years. A exemplary gross sharing statement is placed astatine ANNEXURE - IV.
2) The Revenue Sharing Model whitethorn besides beryllium adopted by the nationalist Land-owning bureau for providing the onshore to a backstage entity for installation of Public Charging Stations connected bidding ground with level terms of 1 per kWh.

4. Residential Charging

There are wide guidelines for EV chargers successful residential societies and GHS.

Quote:

(1) New Connection: Resident Welfare Association, Group Housing Society, an proprietor of a flat, location successful an Association, immoderate different user wrong a GHS, tin petition for a abstracted metered transportation from Distribution Licensee with a dedicated EV charging tariff. This volition beryllium installed wrong the timelines specified successful Electricity (Rights of Consumers) Rules, 2020 arsenic amended from clip to time.
(2) Group Housing Societies (GHS): In consultation with the organisation licensee, Residential Welfare Associations (Society) tin found EV charging stations wrong their premises.
(3) Choice of EV Chargers: Residents tin determine connected the types and fig of assemblage EVchargers to beryllium installed.
(4) Visitor Charging: Community stations tin beryllium equipped to let charging for authorized visitant vehicles.
(5) Private Charging Points: Residents tin instal backstage EVcharging stations successful their designated parking spaces.The Distribution Licensee volition guarantee energy proviso done the resident's existing metre oregon a abstracted sub-meter depending connected consumer's choice.
(6) Increased Load:If assemblage EV charging stations requires much powerfulness than the existent sanctioned load, past GHS volition use to the organisation licensee for seeking summation successful the sanctioned load.
(7) Community Charging Rates: GHS volition find the charging fees for assemblage charging based connected the applicable energy tariff and work ceiling limits laid down nether these guidelines.

5. Vehicle to Grid (V2G)

EV fleets and owners tin transmit their energy backmost to the grid. The tariff for the aforesaid volition beryllium provided determined by due energy regulatory commission.

Quote:

(1) EV fleets enactment arsenic immense energy storages, flexible loads and decentralised vigor resources susceptible of providing flexibility to enactment powerfulness strategy operations.V2G whitethorn beryllium enabled arsenic per the requirements of respective Distribution Licensee.
(2) Tariff for energy nether V2G cognition volition beryllium arsenic determined by the due Electricity Regulatory Commission.
(3) Public Charge Point Operators whitethorn maximise magnitude of astute charging alternatively of uncontrolled/unmanaged charging successful consultation with aggregators/distribution licensee.
(4) Public Charge Point Operators whitethorn compliment EV charging stations with storages and facilitate bi-directional travel of energy betwixt grid and electrical vehicles.
(5) Vehicle and EVSE OEMs whitethorn research capabilities of V2G enabled electrical vehicles and EV chargers to let grid services portion protecting the conveyance batteries against overcharging and discharging.

There are provisions for Heavy vehicles and E-buses charging infrastructure arsenic well. The details are successful the guidelines mentioned below
Link to the guidelines connected the powerfulness ministry website

ferrarirules is offline   (2) Thanks
Read Entire Article