Contract with completion rule does not allow more than one release sales order

1 month ago 13

Hello SD Masters,

I faced I script by which lawsuit needs to person a equilibrium power betwixt measurement declaration and referenced income orders.

In resume:

Contract was created with 12 tons. Customer asked america to marque imaginable to person the divided of these quantity successful 3 income orders of 4 tons.

The point class of declaration is assigned completion regularisation = "C- Item is completed aft the people qty is afloat referenced".

Copy power is settled with "+", successful field Pos./Neg. Quan.

After instauration of 1st. income bid with 4 tons. determination is simply a connection mistake astatine the momento of instauration of 2nd. income order:

"The notation has already been wholly copied oregon rejected

Message no. V2015

Diagnosis

The notation papers cannot beryllium further referenced due to the fact that each items person either been referenced oregon rejected"

I had an thought that the strategy would person a equilibrium control, betwixt declaration and income order. That is, this connection would beryllium shown lone aft I consumed the 12 tons. from the contract.

Is this a modular behaviour from S/4, oregon thing tin beryllium wrong, for here?

Best regards, and thanks!!!

Read Entire Article