Hi
We person precocious switched connected "external staffing" replacing scope point 1KC
We are present utilizing a 3rd enactment assets absorption instrumentality and utilizing SAP API's to integrate into SAP. We person included and mistake logs from SAP astatine integration to notify the squad if determination are issues erstwhile integrating into SAP.
On the mistake log we are capable to ascertain what immoderate of the mistake messages are and cognize however to hole them, nevertheless determination are 2 messages that we are encountering and person reviewed the audit trails and different media to ascertain what would the basal origin beryllium of the issue
They messages look to beryllium consecutive forward, nevertheless we privation to guarantee that we are not overlooking anything
1) Cannot update oregon delete. Actuals person been posted
2) Work bundle xxx Employee xxx is already staffed to assets request 0015
When reviewing the audit trail, the mistake is not being created by the SAP API integrations and these look to person been determination from before
I've reviewed SAP Note
This does not look to person immoderate nexus to the contented astatine hand
Example (Time and Material project)
Work Package duration
The requested assets and the staffed assets successful this lawsuit is the aforesaid person
Planned: 1 hr successful Jan 23
Staffed; 1 hr successful Feb 24
Actual Time Posted 21 hours successful Feb 24
We person besides encountered issues wherever the assets has lone been staffed, but not requested with the aforesaid mistake message
Your assistance successful the substance volition beryllium appreciated
Thanks
Theresa