Ather Energy to set up its 3rd plant in Maharashtra

4 months ago 21


Reply
Old 27th June 2024, 10:31   #1

Senior - BHPian

 
TusharK's Avatar

Join Date: Jul 2017

Location: Pune

Posts: 6,491

Thanked: 57,423 Times

Ather Energy to acceptable up its 3rd works successful Maharashtra


Bangalore-based electrical 2-wheeler shaper Ather Energy volition acceptable up its 3rd manufacturing portion successful Maharashtra. The caller mill volition travel up successful Aurangabad Industrial City (AURIC), located successful Chhatrapati Sambhaji Nagar.

Ather Energy to acceptable   up   its 3rd works  successful  Maharashtra-gq_letzwyaa7icb.jpg

Devendra Fadnavis, Deputy Chief Minister of Maharashtra, precocious met Ather Energy co-founder Swapnil Jain. In a station connected X (formerly Twitter), Fadnavis confirmed that Ather volition put implicit Rs 2,000 crore successful the state.

The Deputy CM besides revealed that the caller installation volition person an yearly accumulation capableness of 1 cardinal 2-wheelers and batteries. It is expected to supply employment to astir 4,000 people.

Ather Energy to acceptable   up   its 3rd works  successful  Maharashtra-gra8oqsxeaavulr.jpg

According to Ather Energy, the determination of the works was chosen with the purpose of reducing logistic costs and hastening the transportation of finished products to customers crossed India.

The 3rd manufacturing portion volition much than triple Ather’s full accumulation capacity. Currently, the company’s 2 accumulation units person a combined capableness of 4.2 lakh units.

Link to Team-BHP News


Last edited by TusharK : 27th June 2024 astatine 10:33.

TusharK is online now   (2) Thanks
Old 27th June 2024, 11:06   #2

BHPian

Join Date: Apr 2023

Location: Bengaluru

Posts: 55

Thanked: 257 Times

Re: Ather Energy to acceptable up its 3rd works successful Maharashtra


Why support mounting up manufacturing units erstwhile the existing ones successful Bangalore and Hosur are precise underutilized? They hardly merchantability 10K units a month. Even if they magically treble their income overnight, that would inactive beryllium 240K units a year. Why bash they request works that tin nutrient a cardinal units? Heck, adjacent OLA sells lone 400K scooters a year. Ather's caller works is simply a lawsuit of burning wealth that's not theirs.

i10_sanjay is online now  
Old 27th June 2024, 11:27   #3

BHPian

Join Date: Jun 2023

Location: Orange city

Posts: 63

Thanked: 84 Times

Re: Ather Energy to acceptable up its 3rd works successful Maharashtra


Quote:

Originally Posted by i10_sanjay View Post

Why support mounting up manufacturing units erstwhile the existing ones successful Bangalore and Hosur are precise underutilized? They hardly merchantability 10K units a month. Even if they magically treble their income overnight, that would inactive beryllium 240K units a year. Why bash they request works that tin nutrient a cardinal units? Ather's caller works is simply a lawsuit of burning wealth that's not theirs.

Ather person lone concentrated connected the higher extremity of the marketplace and has present stepped into the wide marketplace category.
Their attraction connected the North Indian markets are besides present being expanded, adhd to that they inactive person to research the exports markets available.

On the different manus this could beryllium a play for authorities PLI strategy oregon a showcase of spot for declaration manufacturing.

And not to hide the IPO bound institution is called Ather Energy, their pipeline products/services are yet to beryllium known.

Have ever recovered Ather to beryllium a showcase of Indian 2W innovation and a blimpish institution erstwhile it comes to investments.

Ather Energy to acceptable   up   its 3rd works  successful  Maharashtra-ae.png


Last edited by The Pianist : 27th June 2024 astatine 11:30.

The Pianist is online now  

Reply

Copyright ?2000 - 2024, Team-BHP.com

Read Entire Article