Hello gurus,
I'm moving with the assembly processing scenario, utilizing quotation and network. I person 2 "materials," some linked to the aforesaid modular network. The modular network, successful turn, is associated with a modular task that contains lone 1 WBS element.
The process works perfectly for some materials (Screenshot_00.jpg and Screenshot_01.jpg), but lone erstwhile the income papers (which is the quotation) has a azygous item.
When I adhd a 2nd point (Screenshot_02.jpg), an mistake occurs (Screenshot_03.jpg).
It seems similar the WBS constituent to beryllium created is validated successful the income papers earlier it's really generated, oregon the WBS constituent is simply not created astatine all.
I'm utilizing mentation 2024. I judge this mightiness beryllium a programme error, arsenic I've already encountered different contented wherever I had to use SAP enactment 3408903 due to the fact that the strategy wasn't adjacent creating the operative network.
Has anyone experienced a akin contented oregon tin connection immoderate help? @SAPSupport
Regards
Marcio Blos