Hello everyone,
We person planned to see #aATP Alternative Based Confirmation functionality for our project. Have configured substitution strategy (Full confirmation), alternate determination and alternate control. When a income bid is created (for the operation defined successful the access), confirmation is showing zero. It is not showing 'original plant' filed itself successful the income order. It says transportation is not possible.
when I removed the operation from the entree - Configure alternate power app (basically disable ABC), it works mean showing availability.
Am I missing something, could idiosyncratic assistance to resoluteness this issue.
Thanks,
Shilpa S