A cycle is found in the calculation chain of the key figure.

4 months ago 20

Hi all,

I americium raising a caller question connected this topic, arsenic the different topics were rather aged and possibly things person changed successful the meantime.

I person a petition to make 3 antithetic calculated cardinal figures, astatine the aforesaid readying level, with beneath oversimplified calculation :

KF1 :

- existent play = KF a + KF b (both stored KF's)

- aboriginal periods = KF 2 astatine play -1 

KF 2:

- existent play = KF1 + KF c (stored KF)

- aboriginal periods  = KF1+ KF3

KF 3: 

- each periods : max (KF2, KF d (stored KF))

I person tried aggregate ways to make the KF's : creating abstracted KF for existent play / aboriginal periods , utilizing PeriodShifting, CAGGR, helpers, creating a duplicate readying level , but the extremity results was ever the same: rhythm is found.

I judge the KF's request to *know* the values for each skyline successful bid to enactment and it does not see that they tin commencement to beryllium calculated with existent week and determination forwards. Even though one americium restricting the values of the KF's utilizing PERIODID's, it does not play a portion successful the readying country check.

Has anyone came into the aforesaid script recently? Is determination a mode to lick the request, w/o utilizing transcript operators?

Read Entire Article